Placement; Custom Panels - Sub-Zero Classic Serie Guia De Instalacion

Ocultar thumbs Ver también para Classic Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Site Preparation

Placement

CAUTION
Before moving the unit into position, secure the door
closed and protect any finished flooring.
Use an appliance dolly to move the unit near the opening.
If the unit has been on its back or side, it must stand
upright for a minimum of 24 hours before connecting
power.
Plug the power cord into the grounded outlet and roll the
unit into position. Verify the anti-tip brackets are properly
engaged.
IMPORTANT NOTE: If used, the side panels must be
installed before the unit is placed in its final position. Refer
to page 14.
12 | Sub-Zero Customer Care 800.222.7820

Custom Panels

For overlay and flush inset applications, custom door and
grille panels must be installed. The panel size is critical for
a proper fit. To verify panel requirements and dimensions,
refer to the Sub-Zero Design Guide at subzero.com/specs.
IMPORTANT NOTE: Flush inset applications require a mini-
mum 1/2"
reveal on all sides.
(13)
Finish all sides of the custom panel. They may be visible
when the door is open or through the glass door.
CAUTION
A solid panel cannot be installed over the glass door.

Publicidad

Tabla de contenido
loading

Tabla de contenido