Testing and commissioning

Stove start-up must be preceded by testing, which includes an operational check of the following elements:
connection to the smoke evacuation system;
electrical connections;
operation of any connected external probes;
checking that all materials used to build the smoke duct, chimney and chimney pot are regulation and suitable for use.
The testing is positive only when all operational phases have been completed without any anomaly being detected.

Electric scheme R 1000 Pro

CN2
Use and maintenance manual R 1000 Pro
ENCODER
F N
N
Pressure
switch
FLUE GAS PROBE
-TC1+
TERM
N.AMB
N.H2O
N.PEL.
BLU
GND
+5V
ENC
DISPLAY
T.EXT.
ROOM PROBE