Equipment Assembly - Bombard TYPHOON 200 ROLL UP Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

OARS
1.blade
2.oar shaft
3.rowlock
4.groove
5.rowlock socket
6.thumbwheel
To assemble the oars,
insert the oar shaft into the blade and
rotate until the stop notch is engaged.
To position the oars in the rowlocks: (
do not reverse them):
A.Insert the rowlock into the corresponding hole in the rowlock socket.
 When the oar blade is pointing inboard,
 The rowlock groove must point aftwards.
B. Rotate through 180 degrees to row. Make sure that the oar is securely locked in the rowlock socket.
C. Bring the blade towards the aft of the buoyancy tube and engage the shaft in the attaching mount
located aft of the buoyancy tube.
A
THWART
Install the thwart before completing inflation.

EQUIPMENT ASSEMBLY

Caution, the port and starboard oars are different;
B
DEFLATING / FOLDING THE BOAT
C
10 / 11
6
4
5

Publicidad

Tabla de contenido
loading

Tabla de contenido