Bombard TYPHOON 200 ROLL UP Manual Del Propietário página 33

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

1. Deflate the boat.
2. Replace the valve protections.
3. Remove oars and equipment.
4. Remove the floorboard (For S models only - for models with a slatted floor, It is not
necessary to remove the slats to fold the boat).
5. Empty the boat of all water and sand by opening the self-bailers, dry it.
6. Fold in the 2 sides of the main buoyancy tube (A), fold the cones onto the transom, then
roll up the boat around the transom (C). Start again if you feel there is still some air left in
the tubes.
A
buoyancy tube
tube deflated
Stow the boat in its bag.
For some models with a wooden or aluminium floorboard, Stow the floorboard in its bag.
floor
C
11 / 11
B
E
N
G
L
I
S
H

Publicidad

Tabla de contenido
loading

Tabla de contenido