Operation; Prior To Start-Up - HEROSE 15C02 Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 40
Nominal
diameter
DN 10 PN100
DN 15 PN100
DN 20 PN100
DN 25 PN70
DN 32 PN70
DN 40 PN70
DN 50 PN70
DN 65 PN50
DN 80 PN50
DN 100 PN50
6

Operation

6.1

Prior to start-up

Check the following points prior to start-up:
All assembly and installation work has been completed.
If fitted: Remove transport lock before start-up.
The safety guards are in place.
Compare the material, pressure, temperature and installation position with the layout plan for
the pipework system.
Contamination and residues have been removed from the pipeline and valve to prevent
leaks.
30
Operating instructions
Side
Cylinder
part/body
bolt
[Nm]
15
M 8
15
M 8
20
M10
20
M 8
30
M12
35
M12
70
M16
70
M12
70
M16
70
M16
Phone +49 4531 509-0
Torques for side part / body
Check the leak-tightness

Publicidad

Tabla de contenido
loading

Tabla de contenido