Installing The Outdoor Unit; Pipework Connection; Connecting Refrigerant Lines To The Indoor And Outdoor Unit; Connecting Condensate Pipe To The Indoor Unit - Bosch Climate 5000i Manual De Instalación

Ocultar thumbs Ver también para Climate 5000i:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53
Installation
3.3.2

Installing the outdoor unit

▶ Place the box so it is facing upwards.
▶ Cut and remove the packing straps.
▶ Pull the box up and off and remove the packaging.
▶ Prepare and mount a floor or wall mounting bracket, depending on
the type of installation.
▶ Mount or hang the outdoor unit using the anti-vibration coupling for
the feet which is supplied with the unit or is provided on site.
▶ When installing on the floor or wall mounting bracket, attach the
supplied drainage elbow and gasket ( Fig. 16).
▶ Remove the cover for the pipe connections ( Fig. 17).
▶ Establish pipe connections as described in Chapter 3.4.
▶ Mount the cover for the pipe connections again.
3.4

Pipework connection

3.4.1

Connecting refrigerant lines to the indoor and outdoor unit

CAUTION
Discharge of refrigerant due to leaky connections
Refrigerant may be discharged if pipe connections are incorrectly
installed.Reusable mechanical connectors and flared joints are not
allowed indoors.
▶ Tighten flared connections only once.
▶ Always make new flared connections after loosening.
External diameter of
pipe Ø [mm]
6.35 (1/4")
9.53 (3/8")
Table 67 Key data of pipe connections
3.4.2

Connecting condensate pipe to the indoor unit

The condensation catch pan of the indoor unit has two connections. A
condensate hose and bung are mounted on these connections at the
factory and can be replaced ( Fig. 12).
▶ Only route the condensate hose with a slope.
3.4.3

Checking tightness and filling the system

Checking tightness
Observe the national and local regulations when carrying out the
tightness test.
▶ Remove the caps on the three valves ( Fig. 18, [1], [2] and [3]).
▶ Connect the Schrader opener [6] and pressure gauge [4] to the
Schrader valve [1].
▶ Screw in the Schrader opener and open the Schrader valve [1].
▶ Leave valves [2] and [3] closed and fill the system with nitrogen until
the pressure is 10 % above the maximum operating pressure (
page 52).
▶ Check whether the pressure is still the same after 10 minutes.
▶ Discharge the nitrogen until the maximum operating pressure is
reached.
▶ Check whether the pressure is still the same after at least 1 hour.
▶ Discharge nitrogen.
48
Tightening torque [Nm]
Flared opening diameter
18-20
32-39
Copper pipes are available in metric and imperial sizes, the flare nut
thread is however the same. The flared fittings on the indoor and outdoor
unit are intended for imperial sizes.
▶ When using metric copper pipes, replace the flare nuts with nuts of a
suitable diameter ( Tab. 67).
▶ Determine pipe diameter and length ( Page 46).
▶ Cut the pipe to length using a pipe cutter ( Fig. 11).
▶ Deburr the inside of the pipe at both ends and tap to remove swarf.
▶ Insert the nut onto the pipe.
▶ Widen the pipe using a flaring tool to the size indicated in the tab. 67.
It must be possible to slide the nut up to the edge but not beyond it.
▶ Connect the pipe and tighten the screw fitting to the torque specified
in the tab. 67.
▶ Repeat the above steps for the second pipe.
NOTICE
Reduced efficiency due to heat transfer between refrigerant pipes
▶ Thermally insulate the refrigerant lines separately.
▶ Fit the insulation on the pipes and secure.
Flared pipe end
(A) [mm]
8.4-8.7
90°± 4
13.2-13.5
A
Filling the system
NOTICE
Malfunction due to incorrect refrigerant
The outdoor unit is filled with R32 refrigerant at the factory.
▶ If refrigerant needs to be topped up, only use the same refrigerant.
Do not mix refrigerant types.
▶ Evacuate and dry system with a vacuum pump ( Fig. 18, [5]) until
the pressure is approx. −1 bar (or approx. 500 microns).
▶ Open the valve at the top [3] (liquid side).
▶ Use a pressure gauge [4] to check whether the flow is unobstructed.
▶ Open valve at bottom [2] (gas side).
The refrigerant is distributed round the system.
▶ Afterwards, check the pressure ratios.
▶ Unscrew the Schrader opener [6] and close the Schrader valve [1].
▶ Remove the vacuum pump, pressure gauge and Schrader opener.
▶ Reattach the valve caps.
▶ Reattach the cover for pipe connections to the outdoor unit.
Pre-assembled flare nut
thread
3/8"
3/8"
45°± 2
R0.4~0.8
Climate 5000i – 6721824787 (2022/09)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cl5000iu w 26 eCl5000iu w 35 eCl5000i 26 eCl5000i 35 eClimate 5000i serie

Tabla de contenido