Descargar Imprimir esta página

Kemper 79 002 Instrucciones De Servicio página 67

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 186
The wall mount bracket is mounted as follows:
1. Align the wall mount bracket (Pos. 10) according to the drilling diagram
using a spirit level and mark and drill the drill holes.
2. Fix the wall mount bracket with suitable mounting material.
NOTE
Tensile forces of up to 2,800 N (approx. 280 kg) [approx. 717 lbs] per fixing
bolt occur at the upper fixing bolts of the wall mount bracket.
WARNING
Falls and falling components can cause serious injuries.
Incorrect handling can cause components to fall.
Only use standard ladders, e.g. working platforms.
Never stand under suspended loads.
1502759-03
Tab. 32: Drilling pattern - dimensions
Fig. 30: Mounting the slewing ring
- 67 -
EN

Publicidad

loading