9. Fasten the sensor top cover to body
assembly with the supplied screws
and hex wrench.
Protect the wire connections
inside the top cover.
10. Before the supply water is turned on,
be sure all water leaks are eliminated
by tightening all the pipe connections.
NOTE: If for any reason it becomes
necessary to remove the control
stop, make sure the water is shut
off at the main supply valve.
The Flush Valves are preset for fixture volume as marked
on the valve carton. The valve does not require adjustment
for variation in water pressure within its operating range.
11. To set the Flush Valve for proper operation, open the
control stop completely by using the adjusting screw.
12. Activate the Flush Valve several times.
13. In the case of excessive flow rate, gradually adjust the
control stop towards the closed position using the
adjusting screw, until there is suitable water flow into
the fixture.
NOTE: Adjust so water amount is not excessive and
waste can flow properly.
14. The cap for the control stop should be placed after final
adjustments have been made.
15. Tighten the cap firmly with a wrench.
WARNING: Do not open the control stop to the point where the flow from the Flush Valve
exceeds the flow capability of the fixture. In case of a valve failure, the water
must not overflow from the fixture.
INSTALLATION PROCEDURE
Pipe connection
- 9 -
Hex wrench
Pipe connection
Pipe
connection
Escutcheon
Joint tube
Control stop
Cap