2 INSTALLATION
Installation should be performed only by expert
personnel authorised by the manufacturer.
During installation, ensure that the power source
is disconnected from the mains.
2.1 Lifting, transport & unloading
- The equipment is not equipped with specific lifting ele-
ments.
Do not underestimate the weight of the equip-
ment: see technical specifications.
Do not move or position the suspended load
above persons or things.
Do not drop or apply undue pressure on the
equipment.
2.2 Positioning of the equipment
Keep to the following rules:
- Provide easy access to the equipment controls and connec-
tions.
- Do not position the equipment in very small spaces.
- Position the equipment in a dry, clean and suitably ventilated
place.
- Protect the equipment against pouring rain and sun.
2.3 Connection
The Selco mobile units are powered exclusively at low voltage.
16
2.4 Installation
Connection for MIG/MAG welding
- Connect the signal cable (1) to the appropriate connector (2).
Insert the connector and screw the ring nut clockwise until all
parts are secured.
- Connect the wire feed tube (3) to the appropriate connection/
union (4).
- Connect the wire feed tube (5) to the appropriate connection/
union (6).
- Check that the roller groove is consistent with the diameter of
the wire you wish to use.
- Unscrew the ring nut (7) from the spindle and insert the wire
spool.
Insert also the spool pin, insert the spool, reposition the ring
nut (7) and adjust the friction screw (8).
- Release the rolls lever of the wire feeder (9), sliding the end
of the wire into the wire guide bush and, passing it over the
roller, into the torch fitting. Lock the feed support in position,
checking that the wire has entered the roller groove.
- To load the wire onto the torch, press the wire feed push-
button.