Descargar Imprimir esta página

Bosch ACS 763 Manual Original página 56

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 124
en
56 | ACS 763/863 | Initial settings
5.4
Service hoses connection
Connect the service hoses included in the supply with
the high pressure and low pressure (HP and LP) quick
connections.
Fig. 12:
Service hoses connection (HP and LP)
1 Connection for service hose (high pressure)
2 Connection for service hose (low pressure)
i
The quick connections are specifically designed
for refrigerant management according to the SAE
standard.
1. Lubricate the o-rings of the service hoses (HP and LP)
with an oil film.
2. Screw the high pressure service hose (red) to the
HP connection on the station.
3. Screw the low pressure service hose (blue) to the
LP connection on the station.
4. Tighten both service hoses with a tightening torque
of 7.9 Nm.
i
If not used, service hoses can be wound on the back
of the station.
5.5
Use of oil and UV dye tanks
!
Only use UV contrast liquids and oils that are
approved by the vehicle manufacturer. This prevents
chemical incompatibility with the station internal
components.
In the event of problems and failures due to non-
approved liquids, the warranty will be void.
i
The following procedure is necessary to minimize
the amount of air in the tanks.
1. Unscrew the "PAG", "POE", "UV Dye" tank covers and
remove them with the 3 pistons.
2. Fill the 3 tanks with compressor oil for PAG and POE
or UV dye at maximum to the "MAX FILL" line.
3. Lubricate with an oil film the o-rings of the 3 pistons
to reduce friction on the tanks.
|
SP00D00490
2019-03-05
Fig. 13:
Tanks filling
4. Insert the 3 pistons into the appropriate tanks as
1
shown in the figure holding the covers and the
2
pistons inclined until the pistons reach the level of
the liquid.
5. Turn the 3 covers in the vertical position and slowly
push them down into the tanks and screw them in.
4
3
Fig. 14:
Position of tanks
1 UV dye tank
2 New oil tank (POE)
3 New oil tank (PAG)
4 Exhausted oil tank
6. Place the tanks in the appropriate front area of the
station in the order shown in the figure. To secure
them, make sure that each of them is aligned with
the respective bracket/fitting and have a slight
pressure in the straight direction to the station.
1
2
Robert Bosch GmbH

Publicidad

loading

Este manual también es adecuado para:

Acs 863Acs 863-oe