WIKA PG43SA-S Manual De Instrucciones página 10

Ocultar thumbs Ver también para PG43SA-S:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Commissioning, operation
With CIP (cleaning in place) we recommend to clean the measur-
ing instrument again after mounting, using the process estab-
lished at the operator's site.
EN
With COP (cleaning out of place) we recommend to clean the
measuring instrument again before mounting, using the process
established at the operator's site.
On removal from the packaging, and during mounting, particular
care must be taken to avoid damage and any mechanical defor-
mation to the diaphragm.
Model PG43SA-S only: Check the zero point. In case of a zero
offset, carry out a zero point setting. See chapter 5.7 "External
zero point setting".
5.2 Installation
Do not damage the diaphragm; scratches on the diaphragm (e.g.
from sharp-edged objects) are the main causes of corrosion.
For sealing, choose appropriate seals.
For flange mounting, only use sealings with a sufficiently large
inner diameter and centre them; contact with the diaphragm leads
to measuring errors.
When using soft or PTFE sealings, observe the instructions of the
sealing manufacturer, particularly with regard to tightening torque
and load cycles.
For installation, in accordance with the fitting and flange standards
the appropriate fastenings, such as screws and nuts, must be
used.
The vent hole at the underside of the case must not be closed
(only applies to model PG43SA-S).
10
WIKA operating instructions pressure gauge, PG43SA-S, PG43SA-C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pg43sa-cNs 100Ns 63

Tabla de contenido