3
CONSIGNING THE APPLIANCE
3.1
CHECKING PACKAGING UPON CONSIGNMENT
When the goods are received proceed with opening the packaging if there are no signs of damage.
if there are signs of damage to the packaging, within three days from the date indicated on the
documents, draw up a detailed list and report of all damage to the goods, then send it to your dealer.
Do not turn the packed goods upside down! When transporting the package make sure its four
main points are firmly secured (maintain the goods parallel to the ground).
3.2
DISPOSING OF PACKAGING
The various items used for packaging (cardboard, pallets, plastic straps, polyurethane foam) are
normal urban waste products and can be disposed of without difficulty.
If the appliance is destined to countries where are specific standards regarding waste, dispose of
packaging respecting the standards and laws in force.
4
INSTALLING THE APPLIANCE
4.1
APPLIANCE LOCATION
The work surface where the TRF8/TRF12/TRF22 will be located must be suitable for the size of the
appliance, please refer to the measurements given in Fig 2. The work surface must be level and dry
and at a height of 80 cm from the ground with a temperature between 5°C and 35°C.
The power cord connected with the appliance must be reliable grounding.
4.2
WIRING DIAGRAMS
FIG 3-Illustration
14