25. INSTALLATION PROTOCOL
Check ...
Drester ACE model:
DG2A/DI2A
DG2S/DI2S
DG4S/DI4S
DG2C/DI2C
DG3C/DI3C
DG4C/DI4C
Measures are in place to avoid dangers from
accidental spilling or leaks.
Installation is made in accordance with applicable
regulations and directives for hazardous locations.
Unit is grounded in accordance with applicable
regulations and directives for hazardous locations.
Unit is properly ventilated and that ventilation is
grounded in accordance with applicable regulations
and directives for hazardous locations.
The unit has no leaks in:
air supply
air lines
hoses for liquid
All functions of the unit:
pedal(s)
brush(es)
air gun
spray nozzle
timer button
This manual is available at the unit.
Compressed air
Compressed air is dry and free from oil according to
ISO 8573-1, Class 3.4.3, or better.
Compressed air lines and couplings are adequately
dimensioned.
For units suitable for cleaning waterborne paint
Tap water setup: A/B
A. Tap water is connected to the unit, or
B. Unit is set for use with recirculating filtrate water,
as described in this manual.
A drain hose is routed from the unit to a drain.
Y/N
All filters for the coagulation process are fitted as
described in this manual.
20
Drester ACE
Drester ACE
Date
Signature
231721 Rev. 1 2022-12-01
231721 rev.1 2022-12-01