Descargar Imprimir esta página

Ferroli JOLLY TOP 3V Manual De Instalación Y Usuario página 34

Fancoil con motor dc brushless
Ocultar thumbs Ver también para JOLLY TOP 3V:

Publicidad

2
2
Figure 5-1
Mark the places for screws on the wall according to the
unit mounting holes or dimensions specified in Figure
5-12. The drain pipe for condensate water must be
smooth enough to allow unobstructed water discharge.
As shown in Figure 5-2, fasten four screws (①) into a
proper masonry structure.
1
1
Figure 5-2 Diagram for fixing the unit body
Wood structure
Structure the square rod on the beam to set the
lifting bolts.
Steel framework
Directly set and use an angle steel for support.
Suspension bolt
1
1
Casing assembly
1
1
Suspension bolt
Angle steel for
support
Figure 5-4 Installation of lifting bolts
The footings shown in Figure 5-3 are optional. You can
purchase them separately and install them as follows:
1. Put the footings beside the unit to be installed.
2. Place the mounting holes on the unit base into the
corresponding footing locating pin and install screws
①*2 and ②*2 to fix the footing according to Figure 5-3.
1
1
Base
Figure 5-3
3) Install the unit following the steps below in case it
is ceiling mounted.
To match the existing structure, set the screw pitch
according to the unit dimensions.
Original concrete slab structure
Use embedded bolts, and pull bolts.
Newly set concrete slab structure
Set using embedded appliances, and embedded type
of bolts.
Sliding-type
insertion piece
Knife-type
Embedded bolt(hanging and
insertion piece
embedded bolt of piping)
09
2
2
Base
Footing
Rebar

Publicidad

loading