6
Installation
Position the side panels on both sides of the cover plate, as
shown in Figure 21.
Fasten the side panels to the cover plate using three cable
ties per side.
Figure 22: Cable store
Fasten the cable store to the crossmembers using at least
three of the supplied M6x30 screws per side.
Make sure the individual components are correctly posi-
tioned, as shown in Figure 22.
IMPORTANT!
Tightening torque: Screw M6x30 = 10 Nm
70
6.3
Installing the swivel wedge
Figure 23: Swivel wedge
The swivel wedge consists of the components shown in Figure 23.
The principle functions of the swivel wedge are as follows:
Producing the electrical and pneumatic connections between
the tractor unit and semi-trailer.
Feeding electric cables and pneumatic hoses in and out when
cornering.
MUB 007 004 M01 (REV--) 05-2023
ATTENTION!
Incorrect installation jeopardises the safety of the entire
tractor-trailer combination.