Descargar Imprimir esta página

Falltech FT-X 82808SP0 Manual De Instrucciones Para El Usuario página 15

Publicidad

Idiomas disponibles

Idiomas disponibles

causing elements to enter the housing. After cleaning, pull the lifeline all the way out, allow the unit to
air dry, then retract the lifeline into the unit. Clean labels as required.
DO NOT use heat to dry.
DO NOT attempt to disassemble the SRL.
6.2 Service:
If service is required for any reason, such as inspection failure, impact loading, any type of malfunction,
tag the unit as "UNUSABLE" and remove from service. This product includes a feature that enables the
integral SRDs to be replaced individually if the SRD lifeline is worn or damaged during normal use. Any
damage to the shock pack or deployed visual indicator cannot and shall not be serviced or repaired.
Once removed from service, the SRD unit can be removed and replaced using the 5049 Spanner Tool.
SRD unit replacement shall only be performed by a Competent Person or an Authorized FallTech
Repair Center. Read and follow the Spanner Tool User Instruction Manual (448-00009).Failure to do
so can cause the SRL to function improperly, which can result in serious injury or death. SRL must be
inspected by a Competent Person before returning to service. To request a 5049 Spanner Tool,
contact FallTech.
6.3 Storage:
Store the FT-X Cable in a cool, dry, clean environment out of direct sunlight. Position the SRL so excess
water can drain out. Avoid exposure to chemical or caustic vapors. Thoroughly inspect the SRL after
any period of extended storage.
7.0 Inspection
7.1 Pre-Use User Inspection:
Perform an inspection before each use in accordance with the recommendations in Table 1 below.
Inspection
The lifeline should extract and retract completely and without faltering and should remain
taut under tension without sagging.
Extract the lifeline several inches and apply a firm pull to confirm the SRL locks. The locking
should be certain and without skidding. Repeat this lockup at additional places along the
lifeline length to confirm the SRL is operating correctly.
Inspect entire length of the lifeline for broken strands or wires, welding spatter burns or
slag, birdcaging, kinks, or bent strands. Inspect for damage from dirt, paint, grease, or oil.
Inspect for discoloration or other damage caused by chemical exposure or excessive heat. If
any of these conditions exist, remove the SRL-P from service immediately.
Examine the SRL-FBH Connector for cracks, breaks, or warping. Ensure the locking bar locks
in the locked position.
Check the Energy Absorber for rips, tears, or other damage.
Check the Connector Assembly for cracks, deformations, or other damage.
Examine the overall SRL unit for any indications of deterioration or damage.
All labels must be intact and legible.
If an inspection reveals defects or damage to the equipment, remove the equipment from service.
7.2 Inspection Frequency:
Inspection by a competent person at regular intervals is required. The competent person will use the
information in Table 2, SRL Inspection Recommendations, to determine the inspection frequency. Use
Table 2 to determine the inspection frequency. Inspection by a factory authorized inspection entity at
regular intervals is also recommended.
7.3 Inspection Checklist:
Use Table 1: Guidelines for Cable SRL Inspection to inspect the SRL.
7.4 Inspection Results:
If an inspection reveals defects in or damage to the equipment, inadequate maintenance, or activated
fall indicators, remove the equipment from service.
7.5 Inspection Document:
Record inspection results on the Inspection Record provided below or on a similar document.
15
Table 1 - Guidelines for FT-X Cable SRL Inspection
Pass
Fail

Publicidad

loading