Descargar Imprimir esta página

Maytag NEPTUNO Instrucciones De Instalación página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

(not U.S. or Canada)
Contact
the distributor
that sold the appliance
or:
Maytag
International,
8700 W. Bryn Mawr Avenue,
Chicago,
Illinois USA
60631,
773-714-0100,
for information
on product,
shipping
damage,
replacement
parts and
accessories.
Maytag dryer models
manufactured
for operation
on 60 Hz AC are not designed
for use on 50 Hz AC
electrical
service
and conversion
of the product from 60 to 50 Hz operation
is not recommended.
For
additional
information
on 50 Hz products,
contact
Maytag
International.
The electric
service
requirements
can be found on the data label located
on the front of the dryer behind the
door.
EXPORT
ELECTRIC
MODELS
Export electric
models are manufactured
for operation
on either 230/240
volt, 50 Hz or 220 volt, 60 Hz
approved
electric
service.
A two-wire
approved
electrical
service with a 30 ampere fuse or circuit breaker
is
required.
The dryer must be properly
grounded
with a ground wire.
IMPORTANT:
When permitted
by local codes, the dryer electrical
supply may be connected
by means of a
new power supply
cord kit, marked
for use with clothes
dryers,
that is agency
listed, rated at 240 volts
minimum,
30 amperes
with two No. 10 copper
wire conductors
terminated
with closed loop terminals,
open-
end spade lugs with turned
up ends or with tinned
leads.
Do not reuse
a power supply cord from an old dryer.
The power cord or electric
supply wiring
must be
retained
at the dryer cabinet with a suitable
agency
listed strain relief.
2-WIRE
AND
GROUND
SYSTEM
CONNECTIONS
Remove
the terminal
block cover plate.
Insert the power cord with an agency listed strain relief through
the hole provided
in the cabinet near the terminal block.
Note, a
strain
relief must
be used.
Do not loosen
the nuts already
installed
on the terminal
block.
Be sure they are tight.
Use a 318" (1 cm) deep well socket.
Secure
the power cord ground wire to the terminal
block
support
using the ground screw.
If the power
cord has terminals,
place the terminals
over the
existing
nuts on the posts.
The neutral wire in power
cord
must be connected
to the center (silver colored)
post of the
terminal
block.
Secure
in place using the nuts provided
in the parts package.
If the power cord does not have terminals,
use the cupped
washers
ahead of the nuts.
Neutral
2-Wire and Ground
System
Power
Cord
Ground
Power
cord
and
strain
relief
Be sure the terminal
block nuts are tight.
Secure the power cord in position.
Tighten the strain relief screw(s) in
order to clamp the strain relief to the cord.
Replace the terminal
block cover.
BEFORE
OPERATING
OR TESTING,
be sure the machine
is properly
grounded.
EXPORT
GAS
MODELS
Export gas models are manufactured
for operation
on either 230/240
volt, 50 Hz or 220 volt, 60 Hz AC
approved
electrical
service
with a 15 ampere
fuse or circuit breaker.
Export gas models
have been manufactured
for use with natural gas having a higher heating value of
approximately
1025 BTU per cubic foot.
Conversion
to LP gas with a higher
heating
value of approximately
2500 BTU per cubic foot must be performed
by a qualified
service
technician.
A conversion
kit is available.

Publicidad

loading