Descargar Imprimir esta página

BTS BTKF-K Serie Manual Del Usuario página 47

Bombas de aceite caliente

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 120
- Nuts of anchoring stud bolts are installed.
- Anchoring stud bolt holes are filled with concrete grout.
- Anchoring stud bolts are reciprocally tightened.
- Coupling setup is controlled in this situation.
- Concrete is poured into pump frame. Joining of poured concrete and ground
concrete is cared.
- Complete binding of concrete is controlled and anchoring stud bolts are reciprocally
tightened.
- Coupling adjustment is again controlled with template. If there is maladjustment,
coupling adjustment is made again.
- Discharge and suction flange fixings of pump are controlled again. If there are
unnecessary strains and cricks they are eliminated.
- Coupling guards are placed after coupling adjustment.
:Installation of pump group with concrete fixing plug :
- Pump is placed into ground concrete or the ground to be installed carefully.
Pump group frame fixing holes are marked to concrete. Pump group lifted again.
- Marked places where fixing plugs will be placed are drilled carefully according to
standards.
- Fixing plugs are carefully placed into drilled places.
- Steps for installation with anchoring stud bold are made here with same order.
Clutch Adjustment
- Most important factor in operation of pump group without problem is the correct
adjustment of clutch setup. Basic reason for many problems such as vibration, noise,
bearing warming is lack of adjustment or not proper adjusted clutch. Therefore clutch
setup should be done well and frequently controlled.
- Making clutch with flexible materials does not mean that it is a part which will
correct a bad adjustment
(Figure 2) Clutch Adjustment
8

Publicidad

loading

Productos relacionados para BTS BTKF-K Serie