Descargar Imprimir esta página

Broan BEST P195 Manual Del Usuario página 6

Ocultar thumbs Ver también para BEST P195:

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALL
THE HOOD
1. Cut a hole in the bottom of the cabinet in
order to settle the hood.
2. To install the hood, adjust the position of the
clasping side spring by means of the proper
screws, according to the thickness of the
bored panel
to which
it is going to be
anchored.
3. Insert the hood in the cabinet and lock it by
means of the side spring.
4. Use the holes which have already been
made in the casing of the hood to definitively
fix it by means of the 6 mounting screws (B)
- 3.2x16mm.
CLASPING
SIDE
SPRmNG
_}
A
A= rain 7/16"=max 13/16"
CUT A HOLE IN THE BOTTOM
OF
THE CABINET
X= 19-1/2"
FOR VERSION
L:20-1/2"
X= 26-5/8"
FOR VERSION
L:27-9/16"
MOUNTING
SCREWS
(3.2x16mm)
WIRING
Note: This range hood must
be properly
grounded.
The unit should
be installed by a
qualified
electrician
in accordance
with all
applicable national and local electrical codes.
1. Remove the wiring
box cover. Remove a
knockout from the wiring box.
2. Secure
the conduit
to the wiring
box
through a conduit connector.
3. Make electrical connections. Connect white
to white, black to black and green to green.
4. Replace wiring box cover and screws. Make
sure that wires are not pinched between
cover and box.
I
I
WIRING
BOX
COVER
I
I
CONNECT
DUCTWORK
1. Use 6" round metal duct (8" for version 2
motors) to connect the duct connector on
the hood to the ductwork above.
2. Use duct tape to make all joints secure and
air tight.
3. For Ductfree
configuration:
to the duct
connector
of the hood, connect a proper
ductwork (6") that can convey the air to the
upper part of the pensite cupboard.
DUCTFREE
CONFIGURATION
6"
ROUND
J
DUCT
t'
24" TO 30" ABOVE
COOKING
SURFACE
-7-

Publicidad

loading