Installing The Operator - Erreka NAOS NASR70E Manual Del Instalador

Accionador de techo
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4

INSTALLING THE OPERATOR

Assembly positions and levels (sectional door)
1
Front support
2
Door anchor
3
Guide-track
4
Unlocking cable
5
Carriage
6
Central support
7
Central support ceiling strips
8
Rear support
9
Rear support ceiling strips
10 Operator
11 Opening stopper
O
The guide-track must be horizontal
Fig. 3
Assembly positions and levels
C
L
Level H: the guide-track (3) should remain 10
cm above the highest point of the door (see
detail H
.
)
Level C (effective travel): depends on the
guide-track model (ANA01-ANA02) and the
operator's assembly position ( J or K ):
ANA01 (3 sections measuring 1.1 m, 3.3 m):
C=2741 mm (pos. J ); 2691 mm (pos. K )
ANA02 (4 sections measuring 1.1 m, 4.4 m):
C=3841 mm (pos. J ); 3791 mm (pos. K )
Level L (total length): depends on the guide-
track model (ANA01-ANA02) and the operator's
assembly position ( J or K ):
ANA01 (3 sections measuring 1.1 m, 3.3 m):
L=3502 mm (pos. J ); 3452 mm (pos. K )
ANA02 (4 sections measuring 1.1 m, 4.4 m):
L=4602 mm (pos. J ); 4552 mm (pos. K )
INSTALLATION
M278C
NAOS garage door opener operator
43

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Naos nasr100eNaos nasr70emNaos nasr100em

Tabla de contenido