5.0 Installation and Use
Do not alter or intentionally misuse this equipment. Consult FallTech when using this
equipment in combination with components or subsystems other than those described in this
manual. All components or subsystems used with the SRD discussed in this manual must be in
Do not use rebar hooks, large carabiners or large snap hooks to connect to the FBH dorsal
D-rings or to any small diameter non-compatible anchor point as this may cause a roll-out
5.1 Installation to Full Body Harness
Installation for both Single-leg and Twin-leg configurations of the 8' FT-X
Leading Edge SRL-P follow the same steps listed below:
Step 1: On the FBH, lift the dorsal D-ring to the up-pointing position, then loosen the intersection of
the two web straps that pass through the D-ring slot to create slacked loops of about 2" as shown in
Figure 6A. Note that some harnesses may have a built-in tunnel.
Step 2: Depress both release buttons and slide the locking bar into the open position as shown in
Figure 6B.
Step 3: Attach the connector to the slacked loops by inserting the locking bar through the slacked
loops as shown in Figure 6C.
Step 4: Make sure the locking bar is in the fully inserted and in the locked position, see Figure 6D.
Figure 6 - 8' FT-X
A
C
9
compliance with ANSI Z359, CSA Z259, and/or OSHA.
condition and/or unintentional disengagement.
EdgeCore
TM
412-06112 Rev D
412-06112 Rev D
412-06112 Rev D
412-06112 Rev D
WARNING
Class 2 Leading Edge SRL-P Installation
TM
B
Push
412-06112 Rev D
D
412-06112 Rev D
EdgeCore
Tie-Back Class 2
TM
TM
Pull
Push
412-06112 Rev D
Push
412-06112 Rev D
412-06112 Rev D