Descargar Imprimir esta página

dirna Bergstrom bycool green line COMPACT 3.0 Instrucciones De Montaje página 23

Ocultar thumbs Ver también para bycool green line COMPACT 3.0:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

COMPACT 3.0
Tighten (4) M8 nuts to Unit base and (4) to
16
support.
3-6mm.
Cabin roof
Fasten selflocked nut until
16
EPDM gasket is compressed
between 3 and 6 mm.
17
Tighten
the
channelling equipment fits together correctly.
Tighten the nut in point 10 until it comes up
18
against the top part of the interior air distribution
panel.
18
EPDM
Gasket
Cabin roof
Upholstey
EPDM gasket
A
(*) (approx. after tightening)
Hexagon
pieces
Unit base
nut M6 (10)
Stud M6
1mm.
B
C
10 mm*
until
the
(D)
Air ducts
23
Air conditioning for vehicles
B
A
Air duct top side
Interior air distribution
panel
EN
C
16
17

Publicidad

loading