Descargar Imprimir esta página

arjo Enterprise ENT-ACC10 Instrucciones De Uso página 4

Ocultar thumbs Ver también para Enterprise ENT-ACC10:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
Traction cords and weights must be properly installed and securely attached
Ensure that all screw clamps and pulley clamps are fully tightened
A clinically qualified person should assess the risks involved before transporting a
patient while traction equipment is in use
When moving or adjusting the bed, do not allow traction equipment to come into contact
with surrounding objects or people as this may cause injury and/or equipment damage
Do not exceed the maximum safe working load of the equipment:
10 kg
10kg for each pulley
Change the protective foam balls for each patient
Indicates the product is a Medical Device according to
EU Medical Device Regulation 2017/745
CE marking indicating conformity with European Community harmonised
legislation
Mandatory to read the Instructions for Use
Installation and use
1. Lower the bed to minimum height and apply the brakes. Use the ACP to disable the tilt
and leg section controls (refer to the bed user manual). Remove the foot end panel.
2. To install screw clamps or pulley clamps: fully undo the screw and open the clamp.
Position the clamp around the frame. Close the clamp (1), rotate the knob (2) to lock the
clamp together and tighten the screw (3).
3. Fit the uprights (4) into the accessory sockets (5) at the foot end of the bed.
4. Attach a double screw clamp (6) to each upright, at the same height above the mattress
platform. Fit the crossbar (7) into these clamps and secure them.
5. Attach the straight bar (8) using the integral clamp (Note: the straight bar can be fixed in
any suitable position on either upright or the crossbar, according to the type of traction
required. The illustration shows one typical position).
6.
Fit the protective foam balls (9) over the ends of the uprights.
7.
Fit the pulleys (10) to any horizontal part of the frame and attach traction equipment as
required.
WARNING
80 kg
80kg for the complete
traction assembly
EN

Publicidad

loading