NOTE!
The frequency of periodic inspections depends on the legislation, the type of equipment, the frequency
of use and the environmental conditions. Have the Winch and its accessories formally inspected by
qualified personnel, no later than 12 months from the first date of use. Schedule a subsequent
inspection within 12 months of the first. The inspector may postpone complete servicing if the
inspection is positive, up to a maximum of 36 months from the date of purchase.
At their discretion, after the inspection the Inspector may make the following decisions:
a) The Winch is still functional, so it can be used and a positive inspection report is issued. This
inspector may do this for up to a maximum of 36 months from the date of purchase of the Winch.
b) The Winch is not usable and requires servicing. In this case, the device is not suitable for use and,
prior to being back into use, it must pass the servicing test.
Do not use the Winch without having carried out the mandatory periodic inspection. The inspection
carried out by an authorised Harken Inspector must be recorded in the equipment control sheet
present in this Manual and the Inspection report signed by the Inspector must be kept by the Winch
owner.
WARNING!
• Regular periodic inspections are necessary for the safety of users, which depends on the continuous
efficiency and durability of the equipment.
• It is not possible to make alterations or additions to the equipment without the prior written consent
of the manufacturer.
NOTE!
• Check the legibility of the Winch marking.
• Do not replace or modify the Winch with a component that is not designed for this purpose.
WARNING!
• Periodic maintenance must be carried out regularly. Lack of proper maintenance reduces the life
of the Winch and its accessories, can cause serious injury and invalidate the Winch warranty. The
Winch and its accessories must only be serviced by the manufacturer or by qualified personnel
authorised by the manufacturer, in strict compliance with the manufacturer's periodic inspection
procedures.
• When the Top-Crank LokHead Rigging Winch 500 gets wet, due to use or cleaning, it must be
allowed to dry naturally and kept away from direct heat.
In addition to the content of this manual, for optimal maintenance, it is necessary to refer to the
maintenance prescriptions of the suppliers of the rope and the lifting accessories used.
47
22/06/2023