Descargar Imprimir esta página

GRE EESB55 Manual Del Usuario página 6

Electrólisis de sal
Ocultar thumbs Ver también para EESB55:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 9
4. Installation of the vase
The vase must be glued on line (in 050 or 063) that runs towards the swimming pool, after the
filter and after the heater or the beginning of the compressor.
Make sure that there is enough space on the removable side of the vase to be able to with-
draw the electrode.
Do not mount the vase in this direction
Operating
Front view of the electrolyzer
- Fixed red led: No production, unit to standby potentiometer between 0% and 25%. Wait at
least 2 minutes after the standby before putting the unit into production.
- Fixed green led: in production between 25%
and 100%. Use the potentiometer to get the desired level of chlorine.
- blinking red led: Default (See Chapter 7
Electrode calcified)
5. Putting into service
Before any operation, pool's water has to be crystalline. Use flocculent if necessary and filter
the water then clean your filter.
Stapes to follow for the first start of the device:
a) Turn potentiometer to 100 leaving the filtration 24h/24 until the desired chlorine level (mini-
mum 0.5 ppm) is reach.
b) Put back automatic filtration and turn potentiometer to 75.

Publicidad

loading

Productos relacionados para GRE EESB55