Descargar Imprimir esta página

Greencut GLM1400C Guía De Mantenimiento página 64

Ocultar thumbs Ver también para GLM1400C:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
MAINTENANCE
The engine must be switched off and cool enough to touch before any maintenance is carried out.
To keep the equipment running at maximum efficiency, it is necessary to carry out good maintenance on
a regular basis. This will ensure the best performance of your machine and prolong its life considerably.
The maintenance schedule below specifies certain preventive maintenance checks, required tasks and the
frequency with which they should be carried out.
Some maintenance indicated in this manual may be beyond the capability of some users. Contact the
Service Department for those procedures that you are not comfortable performing or for which you do
not have the necessary tools or experience.
Note: The machine may require more frequent maintenance in harsh environments such as extreme
temperatures, dust, etc. The frequency of maintenance is based on general factors with a rough estimate
of 300 hours of machine usage per year. It is important to use common sense when following these
guidelines and to take into account the actual use of the product for maintenance as necessary for the
intended use of the machine. Failure to follow the maintenance schedule, use of incompatible or incorrect
accessories or parts or any negligence on your part will void the warranty.
EVERY MONTH
MAINTENANCE
EVERY USE
Check/reset as
Screws/fasteners
necessary
Cleaning underneath
Check
of the chassis
Lubrication
-
wheel bearings
Cleaning of the
-
starting motor
64
EVERY 3
EVERY 6
MONTHS OR
MONTHS OR
OR 20H USE
50H USE
100H USE
-
-
-
-
-
-
-
-
Check
-
-
-
EN - GLM1400C
EVERY YEAR
OR 300H USE
-
-
-
Check

Publicidad

loading

Este manual también es adecuado para:

1000134