Display Panel Operation - Aros APPENDIX 1500 Manual De Instrucciones

Inversor fotovoltaico para conexión en red
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

8.3

Display panel operation

The operation of the PV-inverter is simple. During normal operation it will work
automatically. However, to achieve maximum usability, we suggest reading the
following information:
(see input section of "Table 1" in appendix)
1.
Automatic ON-OFF: The inverter starts up automatically when the DC-voltage
from the PV panel is within "Working range". Once the inverter starts, it operates
in one of the following 3 states:
Standby: The The voltage is below "Working range" but above "Shutdown
voltage"
Waiting: When the PV string DC voltage is within "Working range", the
inverter remains in the waiting state. During this state, the inverter is waiting
for the connection to the grid.
Normal operation: When the PV string DC voltage is greater than "Initial
feed in voltage", the inverter starts operating
normally. In this state power is supplied to the grid.
Also during this mode the inverter stops feeding the
grid when the voltage is insufficient.
2.
Initialisation display sequence: Once the voltage
supplied by the PV generator is sufficient, the inverter
displays the information as shown in the flow chart.
3.
Display information options: During normal operation
the display shows various information regarding the
status of the inverter. The display is configured to
automatically indicate the power being supplied to the
grid. If further information is required, this can be
accessed by pressing the Sel/Set button located on the
- ENGLISH -
Model
Waiting
Checking=XX sec
Normal State
Pac=xxxxW
Information
during start-up
Page 23

Publicidad

Tabla de contenido
loading

Tabla de contenido