5.4
Filling the tank
Ensure that the tank is horizontal and adequately
secured.
Fire, naked flames and smoking
prohibited
1. Open the lid of the DT-Mobil.
2. Unscrew the cap on the filling connection
3. The container is refilled with the automatically
closing delivery nozzle at filling connection
Optional: Refilling the container with fixed filling
connection and limit value transmitter. For this,
the limit value transmitter must be connected.
Unscrew the cap on the filling connection
The container is refilled with the fixed filling
connection at filling connection
4. Check the tank content with fill level indicator
.
E
E
5. Tightly screw the cap back onto filling
connection
.
C
C
Optional: Screw the cap back onto filling
connection
tightly.
C
C
6. Immediately remove any contamination caused
by refilling the tank with a dry cloth.
7. Close the lid of the DT-Mobil.
52
5.5
Ensure that the tank is horizontal and adequately
secured.
Check the tank content with fill level indicator
.
C
C
.
C
C
.
C
C
C.
C.
1. Open the lid of the DT-Mobil.
2. Connecting cable of the electric pump:
3. Open ball valve
4. Switch on electric pump
5. Remove hose
Refilling
Fire, naked flames and smoking
prohibited
Important!
Danger of electric shock.
Ensure that electric cables/connections
are clean and dry.
i
Important!
The electric pump has a thermal overload
protection device to avoid risks caused
by overloading. Interfering with this
device will automatically shut down the
pump but will not switch off the main
switch. It is important to switch off the
pump using its own switch. Once normal
operating conditions have been re-
established, the pump can be switched
back on. If the emergency shut-off
is triggered under normal operating
conditions, please contact the Technical
Service.
i
Important!
Set the switch of pump
connecting the power source.
2.1
At 12 V/24 V
black terminal clamp:
Connect at the negative (-) terminal of a
suitable voltage source
red terminal clamp:
Connect at the positive (+) terminal of a
suitable voltage source
2.2
At 230 V, insert the plug into a suitable
voltage source.
on the delivery line.
D
D
and automatic delivery
J
J
nozzle
from the DT-Mobil and fully insert
I
I
the delivery spout into the container/tank to be
filled.
.
E
E
to 0 (off) before
H
H
at switch
.
G
G
H
H