Previous Information - Baxtran ARD Manual De Usuario

Ocultar thumbs Ver también para ARD:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

0. PREVIOUS INFORMATION

ASSEMBLY OF THE SET OF THE HELM
With the Axis and chain
installed, it can be used after
pressing the bar down and
pulling out the thrust plunger
LEVER OF REGULATION
The lever of regulation has three positions (ascending, medium and descending)
ascending
media
descending
When the hand pallet is not, the helm must be placed in medium position. The position of the lever of regulation has been adjusted
in factory, if it is necessary to change it, the customer must follow the following steps:
1. If you push the lever downwards in medium position, the forklifts will go upwards, then the user must turn around the unload
screw following the movement of the hands of the clock, the forklifts will not rise when you press the lever.
2. If you push the lever downwards in medium position, the forklifts will go downwards, and then the user must turn the unloading
screw following the movement of the hands of the clock until the forklifts do not go downwards when you press the lever.
28
bar
chain
--
--
--
USER'S MANUAL ARD
After the axis pierces, knock
05 mm pin into pinhole
After the axis pierces, the
chain pass through this hole
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido