Programming And Startup Km2500; Programming And Adjustment; Starting Up - Erreka TORO Manual Del Instalador

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

PROGRAMMING AND STARTUP KM2500

1

PROGRAMMING AND ADJUSTMENT

Turning direction check
O
The turning direction of the operator must be
checked before carrying out the programming.
Programming
The correct operation of the operator and of the
c o m p l e t e s y s t e m w i l l o n l y b e a c h i e v e d a f t e r
programming.
Torque regulation
The maximum torque is limited using an adjustable
mechanical clutch.
2

STARTING UP

Final checks
Following installation and programming, start up the
gate and check all the devices installed.
1 Check the correct operation of the key commands
(transmitter, pushbutton and wall key).
2 Check the correct operation of the safety devices
(photocells or mechanical strips).
3 Ensure that the limit switches work correctly.
4 Position an obstacle and make the gate bang into it
in order to check the operation of the mechanical
clutch in the event of collision.
5 If everything is correct, close the control board
cover.
If the system does not work correctly, find out
why and put it right (see "Failure diagnosis" on
page 76).
Check the turning direction of the operator by
following the control board instructions.
Follow the control board instructions in order to
carry out the programming.
Regulate the clutch as explained in "Clutch
regulation (KM1800 and KM2500)" on page 68.
User instruction
1 Instruct the user with regards to the use and
maintenance of the installation and provide him/her
with the user guide.
2 Signpost the
gate, showing that it opens
automatically and indicating how to operate it
manually.
Where
appropriate,
operation is using the remote control.
English
indicate
that
TORO operator for sliding gates
75

Publicidad

Tabla de contenido
loading

Tabla de contenido