Installation Procedure - Toto CT970CEMFG Manual De Instrucciones

Ocultar thumbs Ver también para CT970CEMFG:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

In order for your new TOTO toilet to fit correctly, please check the following dimensions:
1) Distance between finished wall and the center of the floor drain,
"RI", must be 12" (305mm).
2) Water supply should be approximately 10" to 12" to the left (facing
the bowl) from the center line of closet flange, and approximately
6" above the finished floor.
Finished Wall
Supply
Valve
"RI"
1) Place the Modular Rough-In so that the baseline and the center line of the closet flange line up. Mark the screw locations for the
Rough-In
. Drill holes at the marked locations per the installation type below. In the case of tile or concrete floor installation, use the
provided plastic anchors.
With the location properly marked, drill holes.
For wood floor installation:
• 3/32" for Modular Rough-In
• 11⁄64" for Mounting Blocks
2) Clean any debris out of the closet flange, then install the mounting bolts into the slot of
the flange head down with the threaded shank of the bolt pointed upward as shown (Ill.
1). Slide each bolt until the end of slot.
3) Turn the
Modular Rough-In
recess around the outlet opening. Turn the
the position over the closet flange. With the unit properly aligned, press down firmly to
set the wax seal.
CA UTION: Do not move the Modular Rough-In afterwax seal is set.
4) Install a washer and nut on the T-bolt to secure the r
Ill. 2). Nut should be tightened 1/2 turn after hand-tightening. For the Modular Rough-
In, secure the back side to the floor using the provided screws until level. DO NOT USE
EXCESSIVE FORCE.
To prevent water and odor leakage, please ensure that the wax seal is
fitted properly between the Socket or Modular Rough-In and the flange.
CAUTION
Do not overtighten the nuts, as damage to the plastic parts may result.
5) To install the mounting block, follow the instructions below:
With the modular Rough-In installed, slide the toilet bowl in the Modular Rough-In by
aligning the toilet bowl horn with the Modular Rough-In inlet. (see Ill.4)
Make sure the toilet bowl is aligned properly before marking the center line of the
installation hole on both sides of the bowl and center front bowl. (see Ill. 5).
Remove the bowl and set aside, mark the location of the mounting block following the
measurement found in "Before Installation". Install the mounting block using the screws
and washers provided. (see Ill. 6).
Before Installation (continued)
C/L
Closet
Flange

INSTALLATION PROCEDURE

For concrete/tile installation:
• 9 ⁄32" for Modular Rough-In using green anchors
• 1 1⁄32" for Mounting Block using white anchors
upside down. Firmly press a new wax seal onto the circular
Modular Rough-In
Modular Rough-In
Ill. 4
upright and lower it onto
to the flange (see
Ill. 5
Center lines of the
installation hole
3
6-3/8"
(160mm)
C/L
2"
(51mm)
Base Line
10-1/2"
(267mm)
Toilet Footprint
6" (152mm)
Ill. 1
Ill. 2
Ill. 3
Ill. 6
Toilet
Outline
2"
Center lines of the
installation hole
[51mm]
C/L
2"
(51mm)
10-1/2"
(267mm)
Modular
Wax Ring
not included
Center lines of
Mounting Block

Publicidad

Tabla de contenido
loading

Tabla de contenido