Fitting The Unit In The Roof Hatch; Routing The Electrical Power Supply Leads - Dometic COOLAIR RTX 1000 Instrucciones De Montaje

Juego de montaje para montaje universal 2 (fijación de horquillas)
Ocultar thumbs Ver también para COOLAIR RTX 1000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50
RTX1000/2000, SPX1200T
7.6

Fitting the unit in the roof hatch

➤ Place the parking cooler centrally and facing forwards in the roof hatch
opening (fig. 0).
I
NOTE
Once the unit is in position on the vehicle roof, the seal should make contact all
the way round. Only then can a reliable seal be achieved.
➤ Position the fixing brackets underneath the cab roof (fig. a).
When doing so, slide the fixing brackets between the cab roof (chassis) and
the roof lining.
A
NOTICE!
The fixing brackets must be positioned on a firm base since they will brace the
unit against the cab roof. The contact area of the fixing brackets must be at least
40 mm on all sides.
A
NOTICE!
Do not exceed the specified tightening torque under any circumstances. That
is the only way to ensure that the threaded plugs are not pulled out.
➤ Fix the parking cooler in place as illustrated (fig. a).
➤ Establish the required length of the M8 hexagon-head screws as follows:
Screw length = Distance between bottom edge of fixing bracket and bottom
edge of unit plus 6 mm
If necessary, shorten the hex-head screws to the size determined.
7.7

Routing the electrical power supply leads

D
DANGER!
For EX/III and FL vehicles (according to ADR guideline), a battery master switch
must be installed.
!
WARNING!
The electrical connections may only be made by competent technical staff
with the appropriate specialist knowledge.
Before carrying out any work on electrically operated components, make
sure that they are disconnected from the power supply.
EN
Installation
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Coolair rtx 2000Coolair spx 1200t

Tabla de contenido