Epson SureColor S Serie Guia De Instalacion página 30

Ocultar thumbs Ver también para SureColor S Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

|
Adjusting the Take-up Reel
28
Load the roll core with the alignment tool onto the roll holder:
2.
Place the core on the right roll holder and press it in until part
Move the left roll holder over to hold the roll core in place, then turn the roll holder screw on the
left to lock it into place.
If you are installing the optional heavy roll media system, rotate the handle until part
gray part) is hidden after completing step 3.
From the front of the printer, move the alignment tool to the left side and feed it through the paper
3.
path.
is hidden.
A
(the light
A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S30675S50675S70675

Tabla de contenido