Installation; Space Requirement; Positioning Your Appliance - Haier HRF-800DGS8 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98

5. Installation

Space Requirement

Fig.5-1
Required space when door is opened (Fig. 5-1):
Appliance width: 179,6 cm
50 minimum
Appliance depth: 125,1 cm
50 minimum
50 minimum

Positioning Your Appliance

Choosing the Right Location
This appliance should be installed in a room that is dry and
well ventilated. To provide adequate ventilation, make sure
the appliance is at least 5 cm clear on all sides from kitchen
cabinet (Fig.5-1, 5-2). The distance to the ceiling should be at
1796
least 2,5 cm (Fig.5-3). Any units placed above the appliance
all dimensions in mm
must be clear by 5 cm to allow sufficient ventilation.
If locating the appliance close to a corner, sufficient spacing
Fig.5-2
must be left for opening the doors and removing the shelves.
This appliance should be at least 100 mm from any electric
all dimensions in mm
or gas cooker and 300 mm from any coal or oil stove. If this is
not possible, make sure that appropriate insulation is used.
Avoid exposing the appliance to direct sunlight, and sources
of heat (such as radiators, heaters or cookers).
If this appliance is situated in a cold environment (such as a
shed, outhouse or garage) it will affect its performance.
You may find that the performance of the appliance is not
consistent and this may damage foods. A consistent ambient
temperature of 10 °C or above is recommended.
Fig.5-3
16

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido