Ocultar thumbs Ver también para VS CL03:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

7
Fig. 17: Disassembly and assembly
AVENTICS | CL03/CL03-XL | R402000141–BDL–001–AE
carefully pull the plug straight up, while making sure the
plug is straight.
6
4
5
5. For instructions on removing valve covers, see section
"Assigning spare valve positions" on page 87.
6. For instructions on creating separate pressure zones, see
section "Creating separate pressure zones" on page 92.
7. For instructions on changing between pilot control options,
see section "Pilot air supply" on page 92.
9.2

Assembly

Assembly is the reverse of disassembly. See Fig. 17 on page 95.
However, note the following:
1. Subbases are assembled one by one by first placing the seal
in the sealing slot and then gently pressing the subbases
together, see section "Adding additional valve positions" on
page 89. Make sure the seals have been correctly inserted
and that the electric valve contacts are straight.
2. Ensure that the three tie rods (2) are screwed approx.
10 mm into the first set of tie-rod nuts (3), then insert them
into the subbase system (1). Make sure that the nuts (3)
enter the counter sunk holes of the subbase.
1
2
Disassembly and Exchange
3
8
95
9
10

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vs cl03-xl

Tabla de contenido