Connect The Power Cables And Install The Shrouds - ABB ACS880-04F Guía De Instalación Rápida

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21

Connect the power cables and install the shrouds

Step
1
Install the grounding terminal to the drive module base.
2
Run the motor cables to the cabinet. Ground the cable shields 360 degrees at
the cabinet lead-through
3
Connect the twisted shields of the motor cables to the grounding terminal.
4
Screw in and tighten the insulators to the drive module by hand. Install the
T3/W2 connection terminal to the insulators.
WARNING! Do not use longer screws or bigger tightening
torque than given in the installation drawing. They can damage
the insulator and cause dangerous voltage to be present at the
module frame.
5
Connect the phase T3/W2 conductors to the T3/W2 terminal.
6
Install the T2/V2 connection terminal to the insulators. See the warning in step
4.
7
Connect the phase T2/V2 conductors to the T2/V2 connection terminal.
8
Install the T1/U2 connection terminal to the insulators. See the warning in step
4.
9
Connect the phase T1/U2 conductors to the T1/U2 terminal.
10
• Step drill carefully sufficiently big holes to the inner clear plastic shrouds for
the motor cables to the connected. Smooth the hole edges. Cut the shroud
from the holes to the edge to make it possible to put the shroud around the
cables.
• Remove the plastic sheeting from the shrouds from both sides.
• Install the inner clear plastic shrouds around the motor cables.
11
Remove the plastic sheeting from the outer clear plastic shroud from both
sides. Install the shroud to the drive module.
12
Install the lower front cover to the drive module.
Step
1
Ground the input cable shields (if present) 360 degrees at the cabinet lead-
through.
2
Connect the twisted shields of the input cables and separate ground cable (if
present) to the cabinet grounding busbar.
3
Step drill carefully sufficiently big holes to the lead-through clear plastic shroud
for the cables to the connected. Align the holes in the vertical direction
according to the alignment holes in the shroud. Smooth the hole edges.
Remove the plastic sheeting from both sides of the shroud.
Attach the cables firmly to the cabinet frame to prevent chafing against the
hole edges.
4
Put the conductors of the input cables through the drilled holes in the clear
plastic shroud.
5
Connect the input power cable conductors to the L1/U1, L2/V1 and L3/W1
connection busbars.
6
Move the lead-through clear plastic shroud along input cables to its final
position. Install the front clear plastic shroud and upper front cover. Remove
the cardboard protective covering from the drive module air outlet.
7
Cut the hole for the lead-through clear plastic shroud in the side clear plastic
shroud. Install the side and top clear plastic shrouds to the drive module.
Task (motor cables)
Task (input cables)
EN – Quick installation guide 5
Figure
Page
H
I
J
K
L
-
-
-
-
M
N
P
P
Figure
Page
-
-
O
Q
R
S
T
76
76
76
76
EN
DA
76
-
DE
-
-
ES
-
77
FI
FR
77
IT
77
77
PL
-
-
PT
77
RU
SV
77
TR
77
78
ZH
78

Publicidad

Tabla de contenido
loading

Tabla de contenido