Appendix A: Installation protocol
Copy the installation protocol, fill it in and save it as a service record.
For values, note the value in the result column, otherwise a tick will suffice if the item has been
performed or considered.
NOTE!
If a value is outside the limit or a result is incorrect or missing, this is to be rectified
before the initial start-up and normal operation.
Correct limits or results are given within brackets.
E-PAK 500 No.
Control items
Application requirements (limits)
Material chemical/thermal reaction risk
Radiation heat from surroundings
Delivery checks
Missing components
Transport damage
Before installation
Foundation
Traction forces (2.5 kN horizontally, 6.5 kN vertically)
Total weight
(194/235/360 kg (428/518/794 lb))
Anchor bolts (Hilti HDA-PF 20-M10×100/20)
Access for maintenance/filter replacement (1 m above unit)
Mounting (check availability)
Maintenance switch
Installation room, ventilation openings
Plastic bag
Duct system
PS cable (optional)
Start and control unit, terminals 3–4
Duct system
Duct dimensioning/transport velocity, check performance
Pressure resistant duct
Electrical installation
Connections – Start and control unit
Date:
Performed by:
Result
E-PAK 500