Connection To The Mains Network; Cleaning Preserving Agent When Starting-Up Of Operation Initially; Taking The Unit Into Operation With Coating Material - WAGNER PROSPRAY 3.20 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ProSpray 3.20
5.2

CONNECTION TO THE MAINS NETWORK

The unit must be connected to an appropriately-
grounded safety outlet.
Attention
Before connecting the unit to the mains supply, ensure that
the line voltage matches that specified on the unit's rating
plate.
When connecting to the public low-voltage network, it
is possible that approval of the network operator will be
required. Check the regulations in force in your country and
contact your network operator.
The connection must be equipped with a residual current
protective device with INF ≤ 30 mA.
Wagner's accessories program also includes
a mobile operator protection device for the
electronic supply, which can also be used with
other electronic equipment.
5.3
CLEANING PRESERVING AGENT WHEN
STARTING-UP OF OPERATION INITIALLY
1. Immerse the suction tube (Fig. 4, Item 2) and return hose
(1) into a container with a suitable cleaning agent.
2. Turn the pressure control knob counterclockwise (3) to
minimum pressure.
3. Open the relief valve (4), valve position PRIME (
circulation).
4. Switch the unit (5) ON.
5. Wait until the cleaning agent exudes from the return
hose.
6. Close the relief valve, valve position SPRAY (
7. Pull the trigger of the spray gun.
8. Spray the cleaning agent from the unit into an open
collecting container.
5.4
TAKING THE UNIT INTO OPERATION WITH
COATING MATERIAL
1. Immerse the suction tube (Fig. 4, Item 2) and return hose
(1) into the coating material container.
2. Turn the pressure control knob counterclockwise (3) to
minimum pressure.
3. Open the relief valve (4), valve position PRIME (
circulation).
4. Switch the unit (5) ON.
5. Wait until the coating material exudes from the return
hose.
6. Close the relief valve, valve position SPRAY (
7. Trigger the spray gun several times and spray into a
collecting container until the coating material exits the
spray).
spray gun without interruption.
8. Increase the pressure by slowly turning up the pressure
control knob.
Check the spray pattern and increase the pressure until
the atomization is correct.
Always turn the pressure control knob to the lowest
setting with good atomization.
9. The unit is ready to spray.
STARTING OPERATION
3
5
4
1
2
spray).
11

Publicidad

Tabla de contenido
loading

Tabla de contenido