Preparing The Machine - OP PNEUMATIC UNISPEED Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

OP
S.r.l.
__________________________________________________________________________________
E
N
G
L
I
S
H

PREPARING THE MACHINE

After deciding the diameter of the pipe on which the ring is to be prefitted, follow these
instructions carefully:
Check that the equipment is connected to the compressed air line by means of the
connection on the rear of the machine. The maximum pressure required is 6 bar.
Use filtered, lubricated air.
Set the working pressure as follows:
a) consult
recommended working pressure.
b) Close the mobile guard (Fig. 1, Pos. 8) and keep the
down (Fig. 1, Pos. 9) and at the same time turn the
1, item 4) to set the pressure required; turn to the right to increase or to the left
to reduce the pressure.
c) cWhen the
the cycle start button (fig.1 pos. 9).
Take the prefitting bush suitable for the pipe and the type of fitting (heavy or
lightweight series) and fit it onto the piston rod (fig. 2, pos. 2) keeping it clean and
lightly greased (recommended type of grease KLUBER STABURAGS NBV30).
bushes are marked with the corresponding pipe diameter.
Lock the bush onto the rod by fitting the shear pin provided into its seat (fig. 2, pos.
3).
25131 BRESCIA - Via Serpente, 97 - Tel. 030/3580401 - Fax 0303580838
SELECTORS AND BUSHES AVAILABLE FOR PREFITTING:
PIPE Ø LIGHTWEIGH
6
8
10
12
14
15
16
18
20
22
25
28
30
35
38
42
Always fit an air treatment unit upstream of the air inlet.
the
"GUIDELINE
air pressure gauge
_
HEAVY
T SERIES
SERIES
YES
YES
YES
YES
YES
YES
YES
YES
/
YES
YES
/
YES
YES
/
YES
YES
/
YES
YES
/
YES
YES
/
YES
YES
TABLE
OF
OPERATING
(fig. 1, pos. 3) shows the pressure required, release
32
/
/
/
/
/
/
PRESSURES"
cycle start
buttonpressed
pressure regulator knob
for
the
(fig.
All

Publicidad

Tabla de contenido
loading

Tabla de contenido