Secure the custom panel to the drawer front with eight
(8) #8 x 1/2" T-20 star head screws supplied with the
unit. Tighten the screws but do not overtighten.
Close the drawer. The installation of the custom panel to
the attachment plate is complete.
Continue with the cabinet installation as described in the
Installation Procedure chapter.
Installation Final Check List
Specified clearances maintained to cabinet surfaces.
▯
Drawer handle is level and centered.
▯
Drawer opens and closes properly.
▯
Unit is level.
▯
All packaging material is removed.
▯
Receptacle with correct over-current protection is
▯
provided for service cord connection.
Proper ground connection.
▯
Owner is aware of location of the main circuit breaker.
▯
19