Commissioning Test Run - Festo HSW-AP Serie Instrucciones De Utilizacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
HSW−...−AP/A S
Please note
S Start first of all a test run at reduced operating speed.
S Accelerate in steps until the operating speed is reached.
Pease refer to the calculations for your application for the speed required.
Interrupt the test run if:
S
there is an audible metallic knocking of the stop screws
the double rollers do not run smoothly in the path guide
the end positions are not reached
the work load falls down.
Note the instructions for troubleshooting in chapter 12.
S

Commissioning test run

1. Tighten the two upstream one−way flow
control valves:
at first completely
then loosen approximately one turn.
2. Make sure that the operating conditions
lie within the permitted ranges.
Please note
The permitted kinetic impact force at the
end stop applies for certain mass−speed
combinations. It must not be exceeded.
S Make sure that the permitted values for
the positioning time as a factor of the
work load are observed (chapter
Characteristic curves").
Festo HSW−...−AP/AS 0707a English
Fig. 27
Fig. 28
49

Publicidad

Tabla de contenido
loading

Tabla de contenido