CHAPTER 2.
TRANSPORT AND INSTALLATION.
Knocks and sudden movements must be avoided
when transporting the equipment. The equipment
will
always
be
transported
packaging must be protected from water.
The GAR CUT (V. Industrial) equipment has lifting
eyes. Preferably use this system.
IF A TRANSPALLET IS USED FOR LIFTING, MAKE
SURE THE EQUIPMENT IS STABLE.
2.1 ELECTRICAL AND PNEUMATIC INSTALLATION.
The
location
must
requirements:
- Place: Dry and ventilated, far enough away from
the cutting area in order to prevent the metal dust
caused by the cutting process from getting into the
equipment.
- Electrical installation. Magnetothermal switch.
GAR CUT 1050
50 A -230V 32 A -400V
- Supply hose:
GAR CUT 1050
Length
230 V
2
10 m
6 mm
>15 m
10 mm
2
CHAPTER 3. START-UP. ADJUSTMENT AND OPERATION CONTROLS.
3.1 OPERATION CONTROLS.
Fig. 3 – Front GAR CUT (V. Industrial) equipment.
Control and adjustment.
-{}-
I1
L1
F1
F2
3.2 START-UP PROCESS.
GAR CUT (V. INDUSTRIAL). Instructions Manual.
vertically.
meet
the
following
GAR CUT 1350
63 A -230V
35 A-400V
GAR CUT 1350
400 V
230 V
400 V
2
2
6 mm
10 mm
10 mm
6 mm
2
16 mm
2
10 mm
L2
L3
M
DO NOT FORGET TO FIT THE EARTH
CONNECTION INTO THE PLUG.
The
The standard equipment leave the factory with
the voltage selector at 400 V, in order to protect it
against negligence in the connection.
Fig. 2. Change of Voltage. Switch l1.
1º. Place screw T in position 2.
2º. To connect the equipment place handle in 230
V. position
- Pneumatic installation: Minimum capacity of the
installation 250 l/min - 6 bar.
The pneumatic intake can be carried out directly
from the compressed air circuit, although it is
recommendable, if the air contains a considerable
amount of humidity or oil, for a gas pre-heater to
be fitted in the input. Thus we will avoid arc
2
ignition failures as well as premature wear of the
2
consumable elements (electrode and nozzle).
l1 - ON/OFF switch 230/400V.
L1 - Green light indicating "ON" status.
l2 - Cutting power selector switch.
Pos 1. Ordinary steel cutting up to 10 mm.
(Nozzle 1.1 or 1.3 mm).
Pos 2. Ordinary steel cutting up to 25 mm.
(Nozzle 1.3 or 1.6 mm).
F1, F2 - Protection fuses.
I2
L2 - Red light indicating equipment disconnected due
to lack of pressure.
L4
L3- Amber light indicating equipment disconnected
due to overheating.
L4 - Green light indicating cutting process.
L5 - Green light indicating pilot arc process (timed
L5
two seconds).
CN3 - Output euroconnector for quick connection of
cutting torch. Safety cap.
CN4 - Quick connector for earth cable.
M- Pressure gauge.
CN3
Pos. 1
Pos. 2
T
14