Transport And Installation - gala gar GALA MIG 4100 Manual Técnico De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CHAPTER 2.

TRANSPORT AND INSTALLATION.

Fig. 2 - Elevation system.
2.1. ELECTRICAL SUPPLY INSTALLATION.
The electrical installation of the equipment making up the system must be carried out by specialised personnel
according to the standards in force.
The location must meet the following requirements:
Place: Dry and ventilated, far enough away from the welding area in order to prevent the metal dust caused
by the welding process from getting into the equipment. The equipment must not be used in the rain.
PLACE THE WELDING MACHINE ON A FIRM FLAT SURFACE.
IF EQUIPMENT OF THIS KIND TIPS OVER IT CAN HAVE VERY SERIOUS CONSEQUENCES.
The main switchboard where the machine has to be connected must be comprised of a differential circuit
breaker and a magnetothermal switch.
AUTOMATIC CIRCUIT BREAKER (IA): Three-pole or four-pole. The instrument will be chosen according to the
characteristics plate. We advise choosing a slow type Intensity-Time characteristic (Curve G), as false tripping
could occur due to transitory overloads.
DIFFERENTIAL CIRCUIT BREAKER (ID): Four-pole or three-pole with minimum sensitivity of 300 mA. The aim
of this switch is to protect the personnel from direct or indirect contact with electrical parts under voltage. The
differential circuit breaker is selected with a superior gauge to ID.
L 2
L 3
L 2
L 1
L
L
3
PE
PE
EQUIPMENT
GALA MIG 4100
GALA MIG 5100
GALA 4100 Complet
If a supply hose longer than 5 metres should be required, you should replace the existing hose (See Figure 4
mark K) with another one whose section must be chosen according to Table 3. To carry out this operation
remove the side of the equipment (mark 23 on the general parts explosion), the terminals of the supply hose are
adjacent to the intake stuffing box (mark 22 on the general parts explosion).
GALA INDUSTRIAL. Instructions Manual.
transporting the equipment. The transport position will be shown
by arrows on the packaging. In any case, the packaging must be
protected from water.
with a crane. To assemble the modular system follow the
assembly instructions enclosed with the transport trolley or bottle
support. The assembly will be carried out by suspending the
equipment as shown in figure 2.
The connection to the mains is made from the intake hose. The Figure on the left
shows the connection of the intake hose to the two most common types of
standardised plug (IEC 309-2). In this figure L1, L2 and L3 show the phase cables
and PE represents the earth protection conductor.
DO NOT FORGET TO FIT THE EARTH CONNECTION INTO THE PLUG.
1
Table 5 - Electrical data of the installation.
INTAKE HOSE (INSULATION)
CONNECTION AT 230 V
10 m
15 m
20 m
2
2
6 mm
6 mm
10 mm
2
2
6 mm
10 mm
10 mm
2
2
6 mm
6 mm
10 mm
Knocks and sudden movements must be avoided when
The power source has some lifting eyes so that it can be lifted
DO NOT LIFT EQUIPMENT WITH GAS BOTTLE MOUNTED
CONNECTION AT 400 V
10 m
15 m
2
2
6 mm
6 mm
2
2
6 mm
6 mm
2
2
6 mm
6 mm
AUTOMATIC
CIRCUIT BREAKER
230 V
20 m
2
2
6 mm
32 A
2
2
10 mm
50 A
2
2
6 mm
40 A
20
400 V
20 A
25 A
25 A