11.3.2.- LA70 INSTALLATION AND CONNECTIONS
Make sure that the machine is switched off during the assembly operation. Clear
the work area and use security clothing.
Check the power supply and disconnect the power supply to the crane.
Do not forget to connect the earth cable.
Use only cables supplied by the manufacturer for the connections between the
Master module and the Slaves (or expansions).
Find a suitable place for the installation of the infrared transmitter, away from elements,
which could generate intense electrical disturbances and obstacles to the transmission of
light.
Choose the correct power supply and connect it.
Fit the jumper selector in master position.
Select the code programmed in the EEPROM memory of the transmitter.
Make sure to put the protection cork supplied with the Master module in the last expansion
module installed.
LA70M AC / LA70M DC
Maximum number of expansions (for each Master module) = 2
TM70Bi V4.1 (03/12)
1121174.pdf
IKUSI reserves the right to modify this information without prior notification.
AC/DC POWER SUPPLY
ID=3 (*)
LA70M EX
LA70M EX
CORK
41