Maintenance And Inspection Table - CEMO CENTRI SP 30 Manual De Instrucciones

Sistema de depósito diésel móvil
Ocultar thumbs Ver también para CENTRI SP 30:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

GB
6.2 Maintenance and inspection
Interval
Assembly
As required
Outside of filling station
Monthly
Container
Monthly
Piping system
Monthly
Transport wheels
Tyre pressure of the transport wheels: 2 bar.
Electrical connection of the pump
with terminal clamps
Connect a 4 m connection cable with terminal
clamps to a suitable D/C power source:
• Red:
positive terminal (+)
• Black: negative terminal (-)
i
Important!
In the black holder on the connection
cable is a blade fuse compliant with
DIN 72581/3C.
Blade fuse compliant with DIN 72581/3C
a
Terminal clamps red (+)
b
Terminal clamps black (-)
c
Electrical connection of the pump
with battery
Problem
Pump does not run
when battery inserted
Pump does not run
when battery inserted
Pump does not run
when battery inserted
Pump running,
but nothing is being
delivered
Pump running, but
little is being delivered
18
Action
Remove any dirt
Visual check for damage
Check hoses for cracks and porosity, check fittings for
leaks (replace defective parts)
Check air pressure (2 bar)
Possible cause
Battery empty
Battery incorrectly inserted
Contact springs are soiled
or bent
Blade fuse as required by
DIN 72581 25 A is defective
Delivery line ball valve closed
Ventilation opening closed
Hoses are blocked or kinked
Battery voltage too low
Air bubbles in the liquid
a
Solution
Charge battery
Insert battery with poles facing downwards
Clean or straighten contact springs
Blade fuse is now located in the
battery housing; remove four screws
and replace fuse
Open ball valve
Open ventilation opening in screw cap
Check hoses
Charge battery
Leave the tank to stand for a few minutes
c
b

Publicidad

Tabla de contenido
loading

Tabla de contenido