Figure 4 Analyzer components
6
1 Analyzer
2 Power cord, 115 VAC
7
3 Thermal paper (2x)
4 Compression fitting, ¼-in. tube x ¼-
in. MNPT
6
A1000 S10 model shown
7
A1000 S20P and A1000XP models only
8
120-ohm, 24 AWG, shielded twisted pair cable made for EIA RS485 applications.
5 Passive terminator, 120-ohm
6 BNC tee connector
7 Sample tubing, ¼ in. OD, 1.7 m
(5 ft), PFA
8 Drain tubing, ¼ in. OD, 3.3 m
(10 ft), polypropylene
Figure 5 C80 controller components
1 C80 controller
8
2 Trunk cable, 3.3 m (10 ft)
3 Power adapter, 9 VDC
Installation
D A N G E R
Multiple hazards. Only qualified personnel must conduct the tasks
described in this section of the document.
Installation guidelines
N O T I C E
Do not install the analyzer in an environment with a caustic atmosphere without a
protective enclosure. A caustic atmosphere will cause damage to electronic
circuitry and analyzer components.
N O T I C E
High internal temperatures will cause damage to instrument components.
4 Passive terminator
5 BNC tee connector
English 9