Ingeteam
1.
Open the box from the top.
2.
Remove the side, pre-cut tabs, leaving an opening free.
3.
Fold the tabs outwards.
4.
Insert a bar capable of supporting the unit´s weight via the two holes it has. The maximum diameter of
the bar can be 1 in.
18
Transporting the equipment
ABO2012IQM01_ - Installation and Operation Manual