It is recommended that the holes must have a slightly downward inclination of 3-5 degrees to prevent any
backflow of water from the pipes.
3 °
TILITING
DRAINAGE HOLE
This air conditioner has a double system to drain the condensate moisture automatically.
Before install the A ir Conditioner choose which is the suitable system for your installation.
Please read carefully the follow instructions.
System "A": drill a hole through the wall measuring
30mm in diameter in the position shown in the paper template. Drainage occurs by gravity.
For this reason, it is essential for the drain line to have a minimum downward inclination at least 3 degrees
throughout its length: connect the drain pipe (from rubber terminal to the air conditioner (back side) after
unplugged the black rubber cup (see picture below. With this solution you can drain the condensate moisture to a
suitable place to do not cause any problems to your neighbours.
(Available only for standard unit)
System "B": in case of impossibility to install the drainage pipe as showed on "A" system. Do not unplugged the
black rubber cup (Figure below).
The condensate moisture will go outside by the two big pipes (see picture below).
If you choose this solution be sure that the condensate moisture do not cause any problems to your neighbours.
2.4 FASTENING THE BRACKET
- Drill the holes for anchoring the fastening bracket to the wall using preferably the 6 holes showed in black on the
paper template. If the wall is not sturdy enough it is advisable to use extra anchor bolts using the holes showed in
grey on the paper template.
- The anchor bolts provided require a 8mm holes; the wall should be inspected to determine if provided bolts are
useful or if it is necessary to use a different anchorage. The manufacturer is not liable in case of underestimation of
the structural consistency of the anchorage made at the time of installation.
19