9. Operation
All software menus can be selected from the "main menu" using
the [Up] and [Down] buttons, and accessed using [OK].
Press [Esc] to return to the previous menu level.
The menu structures for the submenu levels are illustrated by
means of a graphic.
main menu
process
start
terminate
batches
Structure of the "process" menu
9.1 Switching on the system
1. Open the dilution water supply.
2. Switch on the main switch for power supply.
The system starts.
1
2
3
4
5
Fig. 13 Start-up display
3. Press [OK] to confirm. The "main menu" appears.
The system is ready for use.
main menu
process
controller ClO2*
alarm
service
setup
maintenance
* The "controller ClO2" submenu only appears, if the controller
has been defined under "setup" > "controller ClO2".
30
9.1.1 Adjusting the process (how many batches)
To specify whether just one batch or several batches of chlorine
dioxide is to be prepared, or whether the production process
should run continuously, proceed as follows:
1. "main menu > process" > [OK].
process
start
terminate
operation
"operation" > [OK].
operation
operation
ext. batch tank
int. batch tank
ext. batch tank
"int. batch tank" > [OK].
int. batch tank
X batches
0 = continuous
X: 1....20
The system produces the selected number of batches.
X: 0 Continuous production
The production process is running until the external batch tank is
filled.
9.2 Starting production
9.2.1 Starting chlorine dioxide production
1. "main menu > process" > [OK].
process
start
terminate
operation
2. "start" > [OK].
start
start
back
3. "back" > [OK], the command is cancelled.
start
Start ClO2 production?
4. "Start" > [OK], chlorine dioxide production starts.
24,5 °C
0,23 mg/l
Dosing starts automatically as soon as the batch tank is filled.
process running
.........
1
2
3
4
5