Hydraulic Connections - EdilKamin IDROPELLBOX Instalación Uso Y Mantenimiento

Ocultar thumbs Ver también para IDROPELLBOX:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 65
(Reserved for DEALER)
IDROPELLBOX MUST NEVER BE MADE TO OPERATE WITHOUT WATER IN THE SYSTEM.
MUST BE MADE WITH A PRESSURE OF ABOUT 1.5 BAR.
IT CAN BE DAMAGED IF IT IS IGNITED WITH NO WATER IN THE SYSTEM.
The hydraulic connection must be performed by quali ed personnel who can issue a declaration of conformity according to the
Ministerial decree no. 37 ex L.46/90. Reference must however be made to the laws in force in the individual countries.
Water treatment
Foresees the addition of antifreeze, de-scaling and corrosion substances. In the event that the water used for lling and toping up
has a hardness greater than 35° F, use a water softener. For suggestions please refer to regulation UNI 8065-1989 (Water Tre-
atment In Heating Systems For Civil Use).
Note on return water temperature.
An appropriate system must be set up to guarantee that the return water temperature does not fall below 45-50 °C.
Incorporated hydraulic kit.
The hydraulic kit incorporated in the boiler- replace.
R

HYDRAULIC CONNECTIONS

S:
Drain 3/4" male
R:
System return 3/4" male
C:
Fill/Top up 3/4" male
HYDRAULIC CONNECTIONS
S
C
M
VSP
M:
System in 3/4" male
VSP: Safety valve 3/4" female
- 32
-

Publicidad

Tabla de contenido
loading

Tabla de contenido